FuelDeck™ by Logicraft · since 1994
FuelDeck™ is aviation fuel management software from Logicraft. It collects fuel records, checks quantities and flight details, and delivers traceable data to the teams and systems that reconcile and account for fuel. Thirty years of Logicraft fuel accounting, turned into software.
Gallons of Jet-A captured & reconciled for clients · 726,374,861 reconciled
Our reach · by the numbers
Airports where Logicraft collects, validates and reports fuel data
Historical fuel records behind the uplift-history screen. Two decades of field data.
Gallons of jet fuel processed and validated for clients
Years of aviation fuel accounting, reconciliation and data services. Since 1994.
The launch film · 1:19
Picture the fuel ledger as an airport departure board. Tickets arrive six ways, go through four checks, and the one that fails is held with the reason, then healed onto the flight that actually flew. Captions are on, so it works with the sound off too.

The 98% in the film comes from our touchless case study of 23,207 live fuel tickets at 50 stations. No human touch means nobody pinned a fuel day, flight or tail, edited a field, overrode or re-validated the ticket. Clicking Post on a machine-validated ticket doesn't count as a touch. The figures measure the absence of human intervention, not accuracy. The carriers and tails on the board are made up. Read the case study
The platform
Every source feeds one engine. FuelDeck™ reads a record when it arrives, checks it against your rules and the airline's own schedule, posts it to a single ledger with the evidence attached, then delivers it in whatever format the other side expects. Nothing gets re-keyed.
FuelCounter™ · checked before it posts
Every uplift gets read, matched to a scheduled flight and screened against two decades of history before it posts. If a ticket fails a gate it is held, with the reason, next to the schedule leg it was checked against. Not posted and then found later.
Your rules, field by field, each one set to reject, prompt or flag.
Flight and tail are checked against live departure data, so the fuel ends up on the flight that actually took it.
A mandatory match against the airline's published schedule. Next-day tolerance and tail-number rescue are built in.
An anomaly screen by route and aircraft type. Behind it sit two decades of field data and more than half a million historical records.
Gross, net, metered and ordered stay as written and only get compared on the same basis. A difference is explained before anyone calls it a variance.
A re-sent report, a changed ticket and a second truck are not the same thing. Revisions are tracked, so the source, the ledger and the delivered file never drift apart.
Each posted ticket keeps its source document, its review decisions and its delivery status. When a number is challenged, the answer comes from the record, not from somebody's inbox.
Standard XML for fuel management and accounting systems, mapped per customer. The file that goes out is the ledger that was reviewed.
The proof · touchless case study
Live fuel tickets for airline customers at 50 stations, most in North America and the Caribbean, from July 1 to October 31, 2026. Excel, PDF and CSV files from handler portals, data feeds and email, all run through Logicraft's managed fuel-data service.
Live fuel tickets at 50 stations in four months
Validated and posted with no human touch
Of October's tickets needed a person: 9 of 5,388
Human decisions per 1,000 tickets, September to October
No human touch means the ticket reached validated or posted without anyone pinning a fuel day, flight or tail, editing a field, overriding or re-validating. Clicking Post on a machine-validated ticket does not count as a touch. Needed a person means any of those acts, counted once per ticket. The figures measure the absence of human intervention, not accuracy.
Products
Your central command for fuel intelligence. FuelDeck™ is the suite. One intake for every source, validation shared by every module, one ledger with the evidence on every line, delivery in the format the other side expects. The FuelCentral™ aggregation engine runs underneath.
The platform
Available
Excel, PDF and CSV from handler portals, feeds and email, parsed as they come. Handwritten, printed and thermal tickets too, and ramp photos. 32+ fields in under three seconds, and it is not generic OCR.
Explore FuelScanner™ →
Available
Your field rules, live departure data, a mandatory schedule match and a two-decade uplift-history screen. Then one ledger, with reconciliation, inventory and dashboards.
Explore FuelCounter™ →Ask the ledger a plain-English question and get a table or a chart back. No export, no formula, no waiting on one specialist.
Explore VersoData™ →
Coming H2 2026
Duty and recovery reporting from the audited record, built on the same checked ledger that FuelScanner™ and FuelCounter™ post to today.
Preview DutyCounter™ →
Coming 1H 2027
Aviation fuel tax reporting from the same ledger. The numbers are already checked, posted and traceable.
Preview FuelTaxPRO™ →Nothing to install, no capital project. The first tickets come in through the channels you already use, and every module shares one ledger.
Book a FuelDeck™ demo →FuelScanner™ · reads the record as it arrives
Files first. Excel, PDF and CSV from handler portals, data feeds and the intake email are parsed as they arrive. A layout FuelDeck™ hasn't seen before is held for review, never guessed at. When the record is the ticket itself, handwritten, printed, thermal, or a ramp photo taken in any phone's browser, FuelScanner™ reads 32+ fields in under three seconds and sends anything it is unsure of to one-click review, right beside the original. Ramp to fuel accounting office, end to end, with no new hardware.
In action · sample data
Dashboards by airline, airport, route and period, all on the same posted ledger: demand by day, tickets cleared, exceptions held with their reason explained, burn against uplift. What you see here is sample data.
this month
validated
Who we serve
A fuel ticket is a hand-off. Airlines consume it, into-plane agents produce it, airports and consortia hold the fuel farm behind it. FuelDeck™ opens on whichever side of it you sit.
Scattered fuel records become traceable accounting data. Every uplift is matched to a scheduled flight and screened against two decades of history before it posts.
Any ticket, any airline, accepted the first time. Read in seconds, checked against the airline's schedule before it leaves you, delivered in each airline's own format.
Receipts, transfers and uplifts on one ledger. Statement comparison is built in, every feed is watched daily, and you get the answer without building a spreadsheet.
Validated volumes with the evidence behind every line: the original ticket, each correction, the delivery status. A dispute gets answered from the record.
Trust & security
Fuel data is sensitive. FuelDeck™ runs on Google Cloud. Each company's data is walled off, access is set by role, and every privileged action is logged.
Role-based access, per-company configuration and an audit log of every privileged action. Customer credentials are stored write-only and encrypted. Nobody sees them again, admins included.
Every ticket and record is encrypted in transit with TLS 1.3 and at rest with AES-256.
Each company's data is kept separate and enforced on the server, with signed file links that expire. Your records and your exports stay yours.
Resources
A 2026 Skymetrix study looked at 1.12 million fuel and airport-charge invoices across 31 airlines. 40 percent still arrived as paper or unstructured PDF and were keyed by hand, and one entry in 28 was keyed wrong. Move the sliders to size the question for your own operation. It is an illustration, not a promised saving.
98 percent posted with no human touch, definitions included. Free download.
One in six arrived with a wrong value or a required field left blank. Free download.
Where re-keying costs time, accuracy and evidence.
Practical fixes for the gaps between ticket, ledger and statement.
Illustrative annual exposure
How this is calculated: annual gallons (tickets × 12 × gal/ticket) × your discrepancy rate × an illustrative exposure per gallon of Jet A price × 7%. The Jet A band ($1.00 to $4.50/gal) spans the 2015 to 2025 spot market. It sizes the question. It is not a measured loss or a promised saving, and a quantity difference is never automatically money owed.
Logicraft · thirty years of fuel accounting
Every uplift matched to a scheduled flight and screened against two decades of history before it posts. One ledger your auditors can follow.
Our clients
Logicraft has done fuel accounting for airlines, fuel suppliers and ground partners across the network for thirty years. A few of them are below.
Book a discovery call
A live demonstration on realistic records: a ticket on the wrong day, quantities on different bases, a copy sitting next to a genuine second truck. For each one you see the original, the check and the decision. Nothing to install.